Child Development Center
Fairchild Air Force Base, Spokane, Washington
A planning charrette report and condition assessment for a Child Development Center that houses care for children ranging in age from 6 weeks to 6 years.
Planning
Child Development Center
Fairchild Air Force Base, Spokane, Washington
Child Development Center
Fairchild Air Force Base, Spokane, Washington
DELIVERY METHOD
Design - Planning
CERTIFICATIONS
SIZE
COMPLETION
2019
CONTRACTOR
SERVICES
The Child Development Center (CDC) facility houses care for children with ages ranging from six weeks to six years. Although design standards have changed significantly over the past twenty-four years, he existing facility has not been renovated since its construction in 1994. WJA Design Collaborative prepared a Planning Charrette Report, and during the charrette planning process, the team conducted a project kickoff meeting and site visit to review documentation, clarify the Scope of Work, and produce a report of current conditions. The team is providing three courses of action (COA):
• Option 1: This option was the “low cost” option that satisfies some/most of the objectives of the project. That this option included basic repairs reflecting those that are very general or “stop-gap” in nature and only the most critical issues impacting the inhabitants of the building.
• Option 2: This option identified the priorities and combined the highest priorities into a “middle of the road” approach, or “medium cost.” The approach recommends repairs that are intended to sustain the building elements to meet most, if not all, code compliance.
• Option 3: This option was the “high cost” repair option that fulfills all project objectives. This option included high quality repairs that sustain and modernize the building elements to such a state that full code compliance, and guaranteed performance longevity is obtained.
The three options were presented to Fairchild staff included building schematics and programming-level cost estimates, along with the recommended COA/Option selected by the client. The selected COA will include complete programming documents required for a future Design-Bid-Build project to renovate the facility.